Files
Aislo/docs/wiki/ingest/verification_2026_09.md
T

1.2 KiB

type, status, related_pages, last_updated
type status related_pages last_updated
ingest-register stable
ingest/index
completed_2026-09-01
completed_2026-09-09
design_data_lifecycle
2026-09-10

2026-09 검증 인제스트

원본 상태 반영 위치
docs/raw/verification/2026-09-01_verify_B04_B05_B06_completed_work.md covered_by_verified_pair completed_2026-09-01
docs/raw/verification/2026-09-01_verify_remaining_checked_items.md covered_by_verified_pair completed_2026-09-01_followups
docs/raw/verification/2026-09-09e_계획서_완료근거_이관.md ingested completed_2026-09-09, B07_DesignDetail/B07_standard_drawings_2026_09, standard_quantity_open_2026-09-09
docs/raw/verification/2026-09-09f_계획서_공통기반과_참고_이관.md ingested design_data_lifecycle, multi_environment_safety
docs/raw/verification/2026-09-09g_계획서_0_3_4장_완료근거_이관.md ingested completed_2026-09-09, B07_DesignDetail/B07_standard_drawings_2026_09
docs/raw/verification/2026-09-10_계획서_e_f_g_이관_교차검증.md verification completed_2026-09-09, design_data_lifecycle