docs/raw/verification/2026-09-01_verify_B04_B05_B06_completed_work.md |
covered_by_verified_pair |
completed_2026-09-01 |
docs/raw/verification/2026-09-01_verify_remaining_checked_items.md |
covered_by_verified_pair |
completed_2026-09-01_followups |
docs/raw/verification/2026-09-09e_계획서_완료근거_이관.md |
ingested |
completed_2026-09-09, B07_DesignDetail/B07_standard_drawings_2026_09, standard_quantity_open_2026-09-09 |
docs/raw/verification/2026-09-09f_계획서_공통기반과_참고_이관.md |
ingested |
design_data_lifecycle, multi_environment_safety |
docs/raw/verification/2026-09-09g_계획서_0_3_4장_완료근거_이관.md |
ingested |
completed_2026-09-09, B07_DesignDetail/B07_standard_drawings_2026_09 |
docs/raw/verification/2026-09-10_계획서_e_f_g_이관_교차검증.md |
verification |
completed_2026-09-09, design_data_lifecycle |
docs/raw/verification/2026-09-11_창환경_링크와_깃운영_조사.md |
ingested |
multi_environment_safety |